| Paperclip AI — CEO Briefing
March 31, 2026 at 22:44 UTC · Auto-refreshes every 6h 6 Projects 30 Done 5 Active 67 Planned System Healthy

Executive Summary

32 Agents 102 Issues

Infrastructure sprint S1 is complete — all 5 skills deployed, Postgres memory schema live with 4 tables, Paperclip re-exported and synced to git. This unblocks both StreamVault v3 redesign and AI/ML Quest content enrichment, both now activated in backlog. Kokilla pipeline is production-ready with 15 workflows deployed and first video delivered ($4.75, 54 seconds) — awaiting fresh E2E validation via Telegram. Job search entered Phase 3 — resume and LinkedIn complete, first 10 applications next. Paperclip AI orchestration in 30-day observation phase (checkpoint April 28, 32 agents, $115/mo cap).

Project Stories
📺 StreamVault 85%

Personal IPTV streaming for mobile, desktop, and TV (Fire Stick, Samsung Smart TV)

The Story

Backend is production-complete with 54 tests and Xtream Codes provider abstraction. Frontend v1 was hardened with 150+ PRs and the global player rebuilt using a state machine architecture. But the UI is bad — we're doing a complete v3 redesign from scratch with a UX-first approach. 10-sprint plan with 38 issues is staged and ready.

Journey
✓ Backend✓ API Layer✓ Provider Abstraction✓ Player Rebuild✓ E2E Tests◎ UX Research○ Design System○ Navigation○ Cards & Grid○ Player UI○ TV Mode○ Final E2E
Proof
  • 1,996 unit tests passing
  • 74 E2E tests active
  • Sprint 4 global player rebuild shipped
  • 150+ PRs merged across frontend hardening
Next Up

UX research phase — Dribbble, Pinterest, 21st.dev analysis. 10-sprint v3 plan with 38 issues is ready to activate.

BLOCKED: Waiting on infrastructure sprint completion before starting v3 redesign (now unblocked — infra S1 is complete)
🎬 Kokilla 95%

AI cinematic Telugu music video generator — 4-min songs into 16–24 scene videos

The Story

Fully automated pipeline with 15 production n8n workflows. Handles ingestion, creative direction, GPU rendering on Vast.ai (FLUX + HunyuanVideo), assembly, and Telegram delivery. Event-driven architecture with two approval gates — script review and character preview. First video delivered March 10th: 8 scenes, 54 seconds, $4.75.

Journey
✓ Ingestion✓ Metadata✓ Creative Direction✓ Approval Gates✓ GPU Provisioning✓ FLUX Rendering✓ HunyuanVideo✓ Assembly✓ Delivery◎ E2E Validation
Proof
  • 15 workflows deployed to production n8n
  • First video: 8 scenes, 54s runtime, $4.75 cost
  • HunyuanVideo 1.5: 8.7x faster generation
  • Cost optimizable to under $1/video with batching
Next Up

Fresh E2E test via Telegram to validate full pipeline health end-to-end. No code needed — just execution.

🧠 AI/ML Quest 65%

Interactive gamified AI/ML learning platform — 54 levels across 5 chapters with 8 game types

The Story

Core platform built with Next.js 15 and React Flow v12. Design system complete with Linear Look theme. Sprints 1–7 shipped core UI, node explorations, analogies, and glossary tooltips. Live at quest.srinivaskotha.uk. Content enrichment for chapters 2–5 is planned but waiting on infra sprint clearance.

Journey
✓ Design System✓ Page Layouts✓ React Flow Engine✓ Explorations✓ Analogies✓ UX Polish○ Ch.2 Content○ Ch.3 Content○ Ch.4 Content○ Ch.5 Content
Proof
  • 54 levels live at quest.srinivaskotha.uk
  • 45 unit tests passing
  • PWA support enabled
  • Sprint 7 UX polish shipped
Next Up

Sprints 8–10 — enrich chapters 2–5 with React Flow explorations, D2 diagrams, and visual assets. 10 issues ready in backlog.

BLOCKED: Blocked on infrastructure sprint completion — now cleared (infra S1 complete, S2 validation next)
⚙️ Infrastructure + Paperclip 75%

Production-grade skill ecosystem, Postgres memory layer, and AI agent orchestration platform

The Story

3-sprint initiative. S0 (audit) and S1 (install) are COMPLETE — 5 new skills deployed, Postgres claude_memory schema live with 4 tables, and Paperclip re-exported to git. 32 agents configured with $115/mo budget cap. Currently in 30-day observation phase with checkpoint April 28. S2 validation (skill testing + token measurement) is backlog.

Journey
✓ S0 Audit✓ S1 Install✓ S1 Wire✓ S1 Paperclip Sync○ S2 Validate○ S2 Harden◎ Observation
Proof
  • 5 skills installed: ui-design-system, ux-researcher-designer, playwright-pro, skill-security-auditor, landing-page-generator
  • 4 Postgres tables live in VPS n8n DB (claude_memory schema)
  • 32 agents configured with wakeOnDemand=true
  • 89 Paperclip issues tracked, managed across 4 active goals
Next Up

S2 validation — test agent heartbeats with new skills, measure token usage per heartbeat, verify budget governance.

BLOCKED: GitHub Actions billing issue delaying CI runs — re-enabling April 1 (SRI-89). Using --admin merges as workaround.
💼 Job Search 30%

Senior Full Stack + AI/LLM role — Dallas or Remote, 60-day plan started March 18

The Story

Phases 1 and 2 are complete: resume tailored for AI/LLM roles, LinkedIn profile optimized, skills inventory documented. Phase 3 is next — setting up job alerts and submitting first 10 targeted applications. The main constraint is time competing with active project work.

Journey
✓ Resume✓ LinkedIn✓ Skills Inventory○ Job Alerts○ Applications○ Interviews○ Offer
Proof
  • Resume tailored for Senior Full Stack + AI/LLM roles
  • LinkedIn profile optimized with targeted positioning
  • Skills inventory complete
Next Up

Set up Simplify.jobs alerts for Senior Full Stack + AI/LLM positions. Submit first 10 targeted applications with tailored cover letters.

BLOCKED: Time allocation — competing with active infrastructure and project work
🏺 ChittiCrafts 50%

AI 3D design-to-print pipeline for heritage Indian crafts — pottery, temples, kolam patterns

The Story

Pivoted from OpenSCAD (scored 1.93/5.0 in evaluation) to Hunyuan3D 2.1 which generates valid GLB models in 13.6 seconds. Sprints 0–6 complete with 11 local skills and 5 product designs built. Sprint 7 validation — fidelity testing of pottery, temple, and kolam outputs — is on hold pending HuggingFace Pro access.

Journey
✓ Tool Research✕ OpenSCAD✓ Hunyuan3D Pivot✓ Skills Built✓ 5 Products○ Pottery Validation○ Temple Validation○ Kolam Validation○ Recipes
Proof
  • 11 local skills built
  • 5 product designs: pottery, temple, kolam, bracelet, pendant
  • Hunyuan3D 2.1: 2.5MB GLB in 13.6 seconds
  • OpenSCAD scored 1.93/5.0 — correctly pivoted away
Next Up

Sprint 7 — validate pottery, temple, and kolam designs against fidelity rubric. Requires HuggingFace Pro ($9/mo) decision.

BLOCKED: HF_TOKEN not configured — needs HuggingFace Pro subscription decision ($9/mo)
Q2 Goals & System

Q2 2026 Goals

0/7 complete  ·  0%
Job Search
Kokilla Phase 4
ChittiCrafts v2.0
StreamVault v2.0 Redesign
Brand Growth Machine
Portfolio site updates
Deep research workflows via Telegram

System Health

VPS 2 CPU · 7.8GB · 63GB free
Docker 10 running · 3 stopped
Agents 32 configured · 3 heartbeat
Budget $4.49 / $115 (4%)
CI/CD Billing paused · re-enables Apr 1

Pending Approvals

No pending approvals

Recent Activity

Agent issue.updated
Agent issue.updated
Agent issue.comment_added
Agent issue.comment_added
Agent issue.created
Recent Decisions

Architecture & Strategy Log

2026-03-31: Agent PRs need human review — agents ignore decisions
**Context:** PR #167 installed Python scripts alongside SKILL.md files despite decision log explicitly saying "SKILL.md only, no Python scripts." **Decision:** Agent-created PRs ne...
2026-03-31: Every Paperclip project must have description, repos, goals, PM
**Context:** Projects had no descriptions, no repo URLs ("REPO: Not set"), no goals linked, workspaces assigned to wrong projects (ai-ml-quest under JobSearch). **Decision:** Every...
2026-03-31: Paperclip agent creation requires 5-step checklist
**Context:** Across the session, agents were created missing runtime_config, instruction files, adapter_config, repo URLs, or wakeOnDemand. Each missing piece caused a different fa...